Powering up the RTD

Open the Computer Door and press the power button. Wait for the trainer to run through routine power up diagnostics. The appropriate flight model should start automatically if all the correct panels are installed.

Read More

RTD IOS at a Glance

The Instructor Operator Station (IOS) software is a Frasca developed COTS software suite. It provides the operator with control over the simulation and access to various training management tools.

Read More

Shutting Down the RTD

Have the flight crew land and perform a normal aircraft shutdown. Open the Computer Door and press the Power button on the front of the Computer.

Read More

Converting Flight Models on the RTD

Shut down the RTD. Remove the panels by loosening the quarter-turn fasteners counter-clockwise, one panel at at time. Install the panels by aligning each panel with the connector and the quarter-turn fasteners on the panel, and then push while tightening a quarter turn clockwise. Power up the RTD.

Read More

Readiness Page

The Readiness page displays automatically when a system software or hardware component failure occurs on the RTD.

Read More